Cauldwell Wingate is providing drilling and sitework services for the installation and development of a Water Mitigation system comprised of 20 pumping and monitoring wells joined below grade to existing drainage structures. Wells will be developed and coordinated to align with NYSDEC guidelines and jurisdiction to alleviate systemic issues with groundwater penetration through existing building foundations. Once complete, this Water Mitigation system will be fully integrated into clients existing BMS network to allow for continuous control and monitoring.
top of page
bottom of page